CNOOC adds production from two project starts

CNOOC adds production from two project starts

 

CNOOC Ltd. started production from Luda 5-2 oilfield north Phase I and Kenli 6-1 oilfield 4-1 block.

The Luda 5-2 north phase I project lies in Liaodong Bay of Bohai Sea, with average water depth of about 32 m. The project is utilizing existing processing infrastructure of Suizhong 36-1 oilfield and includes a new-build thermal recovery wellhead platform and production platform. A total of 28 development wells are planned, including 26 production wells and 2 water source wells. The project is expected to reach peak production of about 8,200 b/d of crude oil in 2024.

The Kenli 6-1 4-1 block development project lies in south Bohai Sea, with average water depth of about 17 m. The project utilizes the existing processing infrastructure of Bozhong 34-9 oilfield.  A total of 12 development wells are planned, including 7 production wells and 5 water injection wells. The field is expected to reach peak production of about 4,000 b/d of crude oil in 2022.

CNOOC is operator of both projects with 100% interest.

Published: 25-04-2022

Share:

[mc4wp_form id=2073]

Global Energy Network - Issue 102

Flip through the latest digital issue of Global Energy Network Magazine.

More News

Latest Magazine Banner

OGV-Energy-Subsea-Magazine-Feb-2026-sq-Banner

WellPro Group Banner

Cegal Banner

Leyton Banner

Advertise with us

Advertise With Us - Global Energy Network