Near Miss – Casing stud failure on water injection pump

Near Miss – Casing stud failure on water injection pump

 

Description of Incident: Three operators were conducting a routine start of a water injection pump.

One Operator was opening/monitoring the discharge. While carrying out the task a stud (fastener) from the pump casing failed and was projected in the air.

The system was operating at 120bar at the time. The stud landed on the deck approximately 1.4 meters away from the Operator.

The pump was stopped immediately, and the manual suction and discharge valves were closed. Water injection was shut down approximately 5 minutes later. The stud weighed 4.4kg.

Download the full alert to view the findings and good practice here:
https://lnkd.in/dsNmTxQ

An essential part of that mission is learning from previous experiences through collaboration.

Step Change in Safety offers a searchable catalogue of hundreds of Safety Alerts and Safety Moments are all designed as learning resources that can help improve workplace safety.

Read the latest issue of the OGV Energy magazine HERE.

Published: 10-02-2021

Share:

[mc4wp_form id=2073]

Global Energy Network - Issue 102

Flip through the latest digital issue of Global Energy Network Magazine.

More News

Latest Magazine Banner

OGV-Energy-Subsea-Magazine-Feb-2026-sq-Banner

WellPro Group Banner

Cegal Banner

Leyton Banner

Advertise with us

Advertise With Us - Global Energy Network